Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
Positive Safety Leadership
Timeline
Generic

Jesse McDonald

General Foreman
Saskatoon

Summary

Construction professional prepared for challenges of leading workforce to achieve project goals. Known for implementing process improvements that enhance productivity and safety. Valued for collaborative approach and adaptability to evolving project requirements, possessing skills in leadership and problem-solving.

Overview

19
19
years of professional experience
15
15
Certifications
1
1
Language

Work History

General Foreman

Points Athabasca Contracting
05.2024 - Current
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
  • Established open lines of communication with clients, providing regular updates on project status and addressing concerns promptly.
  • Mentored junior team members in the development of their skills, providing guidance and support that facilitated career advancement opportunities.
  • Ensured compliance with all relevant regulations and industry standards during the execution of assigned tasks, mitigating potential legal issues or penalties.

Ironworker Foreman

Groupe Lar
09.2022 - 04.2024
  • Proactively identified and addressed potential bottlenecks in project workflow, leading to consistent on-time delivery of milestones.
  • Reduced safety incidents by implementing thorough training programs and enforcing strict adherence to safety protocols.
  • Implemented innovative techniques in rigging operations resulting in reduced installation times while maintaining safety standards.
  • Established strong relationships with suppliers to secure competitive pricing on materials without compromising quality standards.
  • Mentored junior ironworkers in proper techniques and best practices for increased skill development and growth within the trade.
  • Inspected completed work for accuracy and adherence to building codes and safety standards.
  • Reviewed work plans and blueprints to ascertain all requirements for project.
  • Determined size, shape, placement, and material of supports based on blueprints and structural standards.

Bridge Foreman/Lift Director

CLOUGH Projects/Pacific Pile and Marine
07.2020 - 08.2022
  • Reduced project costs with diligent budget management and resource allocation.
  • Maintained open lines of communication among team members, fostering a collaborative work environment that increased overall performance.
  • Collaborated with engineers, architects, and other stakeholders to execute successful bridge projects from concept to completion.
  • Conducted post-project evaluations identifying areas for improvement leading to continuous growth and development of
  • Spearheaded innovative solutions for complex bridge construction challenges, resulting in higher quality structures.
  • Was lift Director for all Heavy lifts , Tandoms and Critical for the Project.

Pile Driver Foreman

Besix/Vancouver Pile Driving
08.2019 - 05.2020
  • Ensured accurate documentation of pile driving activities, aiding in smooth project management processes.
  • Reduced project delays by diligently maintaining pile driving equipment, ensuring optimal performance.
  • Aided in risk mitigation by conducting regular assessments of soil stability around driven piles, ensuring safe working conditions for all team members.
  • Expedited construction timelines by efficiently operating heavy machinery such as loaders and excavators for pile handling and placement.
  • Streamlined construction processes for more efficient project completion, ensuring timely delivery of Material off load facility project.

Ironworker Foreman

Custom Steel Erectors
01.2019 - 07.2019
  • Delivered projects on time and within budget by closely monitoring progress and adjusting plans as needed.
  • Determined size, shape, placement, and material of supports based on blueprints and structural standards.
  • Collaborated closely with architects, engineers, and general contractors to ensure seamless integration of ironwork into overall project design.
  • Increased productivity with efficient allocation of resources, tools, and manpower for each project phase.

Iron Worker/ Rigger

KNF Construction
09.2018 - 12.2018
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Mitigated structural issues by promptly identifying and reporting any discrepancies in alignment or positioning of installed materials.
  • Expedited construction progress, aligning and bolting steel beams into place securely.
  • Erected structural steel and iron frameworks for bridges, buildings and other structures.

Iron Worker Foreman

Tron Construction and Mining
08.2017 - 12.2017
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Prioritized safety across job site with specific attention to load suspension, welding, and cutting.
  • Developed comprehensive construction schedules that accounted for all necessary materials, labor requirements, and project milestones.
  • Enhanced project efficiency by effectively managing and directing a team of ironworkers in the completion of construction tasks.

Structural Iron Worker

Agnico Eagle
11.2016 - 07.2017
  • Utilized advanced tools and equipment to expedite the erection process while maintaining precision in alignment and positioning of steel components.
  • Ensured structural integrity by adhering to industry standards, guidelines, and best practices.
  • Mentored junior erectors in proper techniques, boosting overall team performance and skill levels.
  • Loaded and unloaded materials and equipment onto and off construction site.
  • Operated forklifts and boom lifts to complete various tasks.

Ironworker Foreman

Athabasca Contracting Ltd.
04.2016 - 09.2016
  • Proactively identified areas for improvement in existing procedures leading initiatives aimed at optimizing workflow efficiency.
  • Collaborated with cross-functional teams for successful project completion, strengthening interdepartmental relationships.
  • Communicated with management and team members to resolve obstacles and complete Structural steel projects.
  • Implemented quality control measures to ensure consistent product standards, leading to increased customer satisfaction.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Ensured high-quality workmanship through rigorous quality control checks at every stage of construction.
  • Increased productivity with efficient allocation of resources, tools, and manpower for each project phase.

Iron Worker

Custom Steel Erectors
12.2015 - 01.2016
  • Maneuvered and positioned support structures , often manipulating iron by cutting, welding, or bending.
  • Hoisted metal components into place, safely signaling cranes during process.
  • Helped set up and rig up crane.
  • Performed pre-lift meetings with all involved parties to promote clear communication and understanding of roles and responsibilities throughout the lift process.
  • Assisted in rig down, disassembly and loading of crane.

Iron Worker Foreman

Aecon Industrial
05.2014 - 11.2015
  • Elevated team morale by fostering a positive work environment focused on collaboration, open communication, and mutual respect.
  • Facilitated cross-functional collaboration between ironworkers and other trades for seamless integration of work scopes.
  • Streamlined communication between team members, leading to improved coordination and faster problem resolution.
  • Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
  • Created and implemented plans to maximize efficiency of workers.

Iron Worker

B.F.I Constructors
08.2013 - 03.2014
  • Hoisted metal components into place, safely signaling cranes during process.
  • Maximized material usage by skillfully measuring, marking, and cutting steel components with precision tools.
  • Ensured accurate alignment of structures, preventing potential long-term structural issues.
  • Minimized errors with careful use of leveling instruments to verify the correct alignment of structural components before securing them permanently in place.
  • Improved project completion time with effective coordination and communication among team members.

Iron Worker

PCL Industrial
08.2013 - 03.2014
  • Maintained accurate records of inventory, ensuring proper stock levels were maintained for efficient loading processes.
  • Addressed any equipment malfunctions promptly, minimizing downtime and keeping the loading process on schedule.
  • Developed strong relationships with external partners such as suppliers and carriers, allowing for seamless coordination between all parties involved in the shipping process.
  • Implemented quality control checks during the loading process, reducing instances of damaged goods being shipped out.

Iron Worker

B.F.I Constructors
01.2012 - 05.2012
  • Reduced production costs by optimizing material usage and minimizing waste during the fabrication process.
  • Mentored junior fabricators, sharing expertise in steel cutting, bending, shaping, and assembly techniques for professional development.
  • Improved project efficiency by accurately interpreting blueprints and specifications for structural steel fabrication.
  • Lifted or moved materials and finished products using large cranes.
  • Operated welding equipment to assemble and repair metal structures and elements.

Iron Worker

Split Steel Erectors
05.2011 - 12.2011
  • Hoisted Modular stuctures into place, safely signaling cranes during process.
  • Provided reliable support during rigging operations to ensure the safe lifting of Modularstuctures into place.
  • Ensured structural integrity by properly installing and aligning steel components according to specifications.
  • Followed blueprints and instructions from supervisors to erect columns, beams and girders.
  • Unloaded and positioned prefabricated steel and heavy equipment using hoisting equipment, such as cables, pulleys, or hooks.
  • Attached loads using slings, chains, shackles, hooks, cables and other rigging equipment.
  • Rigged for heavy lifts according to blueprint requirements.

Iron Worker

B.F.I Constructors
09.2009 - 04.2011
  • Assembled complex steel structures to support integrity of high-rise buildings.
  • Performed detailed inspections of ironwork to identify and rectify any defects, ensuring quality control.
  • Welded, cut and bent steel as necessary with torches, metal shears, and welding equipment.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Skillfully operated hand tools such as spud wrenches or drift pins for aligning bolt holes in steel members during assembly processes.
  • Cut, positioned, and bolted up structural steel, contributing to durability of structures.

Iron Worker

KamTech Services
06.2006 - 07.2009
  • Increased project durability by expertly fastening steel members using bolts or welding methods based on design requirements.
  • Provided reliable support during rigging operations to ensure the safe lifting of heavy steel beams into place.
  • Promoted a positive work environment by mentoring junior ironworkers in industry best practices and safe techniques.
  • Demonstrated adaptability in tackling diverse projects ranging from commercial buildings to industrial facilities.
  • Fabricated steel frames, columns, beams, and girders according to blueprints or instructions from site managers.

Education

Journeyperson - Structural Iron Worker

SIAST Palliser Campus
Moose Jaw, SK
01.2014

No Degree -

Buffalo Dene River High School
Dillion, SK
05.2001 -

Skills

Team leadership skills

Onboarding and coaching

Construction supervision

Job planning

Project scheduling

Effective communication

Training and mentoring

Documentation skills

Project planning

Leading teams

Certification

Structural Iron Worker Journeyperson Red Seal

Accomplishments

  • Supervised team of 52 staff members
  • Collaborated with team of 48 in the development of LNG Load Line Trestle.
  • Achieved 100% by implementing Safe and Efficient Lift Plans for Heavy Lifts on various projects.

Positive Safety Leadership

I am a self motivated individual who loves to make changes and help people with elevating there well being Aswell as there futures I volunteer with an Organization STR8 UP which help helps inner city youth get involved with changing there lives and gives them opportunities for betterment of the inner city youth of Saskatoon, Sk.

Timeline

General Foreman

Points Athabasca Contracting
05.2024 - Current

Ironworker Foreman

Groupe Lar
09.2022 - 04.2024

Bridge Foreman/Lift Director

CLOUGH Projects/Pacific Pile and Marine
07.2020 - 08.2022

Pile Driver Foreman

Besix/Vancouver Pile Driving
08.2019 - 05.2020

Ironworker Foreman

Custom Steel Erectors
01.2019 - 07.2019

Iron Worker/ Rigger

KNF Construction
09.2018 - 12.2018

Iron Worker Foreman

Tron Construction and Mining
08.2017 - 12.2017

Structural Iron Worker

Agnico Eagle
11.2016 - 07.2017

Ironworker Foreman

Athabasca Contracting Ltd.
04.2016 - 09.2016

Iron Worker

Custom Steel Erectors
12.2015 - 01.2016

Iron Worker Foreman

Aecon Industrial
05.2014 - 11.2015

Iron Worker

B.F.I Constructors
08.2013 - 03.2014

Iron Worker

PCL Industrial
08.2013 - 03.2014

Iron Worker

B.F.I Constructors
01.2012 - 05.2012

Iron Worker

Split Steel Erectors
05.2011 - 12.2011

Iron Worker

B.F.I Constructors
09.2009 - 04.2011

Iron Worker

KamTech Services
06.2006 - 07.2009

No Degree -

Buffalo Dene River High School
05.2001 -

Journeyperson - Structural Iron Worker

SIAST Palliser Campus
Jesse McDonaldGeneral Foreman