Summary
Overview
Work History
Education
Skills
Languages
Additional Information
Timeline
Generic

Preston Erickson

Estevan,Saskatchewan

Summary

Adept Industrial Millwright with a proven track record at Saskpower, enhancing machinery performance and safety compliance through effective communication. Excelled in equipment repair and interpersonal skills, achieving top-tier maintenance efficiency and fostering team collaboration. Demonstrated continuous improvement, contributing significantly to operational excellence and safety standards.

Overview

15
15
years of professional experience

Work History

Industrial Millwright

Saskpower
06.2022 - Current
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Adhered to all workplace safety policies, regulations and compliances.
  • Conducted comprehensive inspections of machinery to identify potential problems and ensure optimal performance.
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear.
  • Participated in root cause analysis efforts for recurring equipment failures to develop long-term corrective actions.
  • Implemented standard safety procedures to prevent hazards related to industrial machinery and equipment.
  • Collaborated with engineering to design modifications for machinery, enhancing performance and reliability.
  • Mentored junior millwrights as they acquired new skills and gained familiarity with complex industrial machinery operations.

Industrial Millwright

Saskpower
07.2013 - 06.2023
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Made repairs and modified equipment by welding, soldering and brazing to avoid production delays.
  • Troubleshot machinery problems and suggested accurate repairs.
  • Performed routine inspections and maintenance to optimize machinery performance.
  • Diagnosed and repaired complex machinery, leading to reduced downtime and increased production efficiency.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Improved workplace safety with diligent adherence to protocols, lockout/tagout procedures, and hazard identification.
  • Adhered to all workplace safety policies, regulations and compliances.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.

Industrial Millwright

Saskpower
06.2012 - 07.2013
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Made repairs and modified equipment by welding, soldering and brazing to avoid production delays.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Adhered to all workplace safety policies, regulations and compliances.
  • Consistently met or exceeded company performance metrics for maintenance efficiency, equipment uptime, and safety compliance.
  • Disassembled machinery parts and categorized properly before moving to storage.
  • Conducted detailed machinery installations, ensuring operational efficiency and adherence to manufacturer specifications.
  • Implemented standard safety procedures to prevent hazards related to industrial machinery and equipment.

Utility Worker

Saskpower
05.2009 - 06.2012
  • Kept work area clean, neat, and well-stocked to maximize productivity.
  • Collected and disposed of trash and debris.
  • Contributed to a positive work environment through effective communication and collaboration with colleagues across various departments.
  • Verified that all safety procedures were followed while working on utility systems.
  • Trained other personnel in proper maintenance and repair of utility systems.
  • Maintained high standards of workmanship by adhering to industry regulations and company policies during installations, repairs, or maintenance tasks.
  • Assisted in training new hires on company procedures, safety guidelines, and job-specific tasks to ensure a consistent level of service quality across the workforce.
  • Mitigated potential hazards by promptly addressing any safety concerns identified during routine inspections or maintenance tasks.

Education

High School Diploma -

Estevan Comprehensive School
Estevan, SK
06.2008

Journeyperson - Industrial Millwright

Saskatchewan Polytechnic
Saskatoon, SK
11.2004

Skills

  • Safety Compliance
  • Problem-solving aptitude
  • Effective Communication
  • Team building
  • Equipment rebuilding
  • Productivity and safety improvement
  • Industrial Mechanics
  • Rigging Techniques
  • Root Cause Analysis
  • Equipment Repair
  • Machinery Maintenance
  • Preventive Maintenance

Languages

English
Professional Working

Additional Information

OHC - 2 Years

Confined Space Committee - 2 years

Continuous Improvement Safety Team

Timeline

Industrial Millwright

Saskpower
06.2022 - Current

Industrial Millwright

Saskpower
07.2013 - 06.2023

Industrial Millwright

Saskpower
06.2012 - 07.2013

Utility Worker

Saskpower
05.2009 - 06.2012

High School Diploma -

Estevan Comprehensive School

Journeyperson - Industrial Millwright

Saskatchewan Polytechnic
Preston Erickson