Process Engineer in the Lithography department for process and equipment start-up for the Pelican Project.
Assignment for 3 months at New Mexico F11, for learning and knowledge transfer.
Tool Install and qualification for Nikon S210D reuse tool transfer, involving design verification based references package to ensure smooth transfer.
Analyze tool condition and essential parts to rejuvenate the tool, working in parallel with Nikon supplier and US counterpart.
Manage chemical readiness and forecasting for whole department on Solvent, Resist, Cleaning solution, grease, oil, AC gas scanner, Krf gaseous, and Arf Gaseous.
Manage general item involve space and capacity for storage of tools parts (cages,cabinets,chain,lock,fridge.etc)
Manage Data center together with IT team (workstation) for server allocation nikon,gigaphoton,cymer and cannon.
Senior Process Enginner
Silterra Malaysia Sdn Bhd
Kulim
12.2010 - 05.2022
Lead for Metal and of Via layer for AL and Cu BEOL
Process Tool owner for ASML Scanner DUV/ILINE PAS5500 version and TEL Track Act 8 for recipe creation and tuning.
Sustaining, maintaining and controlling process involving 8D problem solving method, 6 Sigma (DMAIC) to improve processing criteria and Line issue.
Project ownership, inter-via qualification for DUV and Arf scanner, for flexibility, cycle time, and mass production activity.
Project ownership for C13 High Voltage Metal 1 process optimization. To improve metal process margin issue.
Project ownership for PAD(Passivation) and Inductor (Thick Top Metal) layer qualification on DUV tool (PAS5500 ASML)
To ensure manufacturing flexibility and further improve cycle time.
Project owner on new Resist qualification for Metal, Reduce cost and increase process margin with extra PR remain for etching process margin improvement.
Project Ownership for Metal ArF, for major capacity upgrade, for fast cycle time required to maintain healthy WIP throughput.